ENG WG2 TG-2.5.1
ENG WG2 TG-2.5.1 Room2.5.1.    Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
All Dashboards  ARM  ENAV  ENG  VTS
2.5.1.    Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
Merge the collaboration of the volunteers and discuss comments about modifications
All R-Mode related items Main task will be progressing R-Mode implementation guideline
John Fischer from Orolia (VP, Advanced R&D)Â will provide a presentation session on 20 October in advance of a review of the input paper ENAV28-5.1.2.4.1 and ENAV28-5.1.2.4.2 Review of input paper / technology review on 21 October
Review of the update proposal of G1129 "The retransmission of SBAS corrections using MF RB and AIS" - Session 2 The objective of this meeting is to review the input paper submitted to ENG14 WG3 with regard to the proposal to update the G1129 "The retransmission of SBAS corrections using MF RB and AIS". - […]
Develop Guideline on the Sustainable Structural Design of Marine Aids to Navigation
Guideline on Performance Estimation:Â To review and develop a guideline on performance estimation of optical aparatus based on existing Recommendation R0205 (E200-5).
Meeting 1 to meeting 4: Develop process of Draft Guideline AtoN equipment exposed to Extreme Environmental Conditions acording the workplan 2018-2022
IMO Correspondence Group on Generic receiver performance standards This meeting will review the work of the correspondence group and provide an update on progress to date.
This meeting will review the latest version of the Guideline.
Review guideline on what makes a good marine solar panel
WG3 closing meeting. A chance for the WG to review and approve completed output papers and the WG report, review progress and plan further work. Items of work that are in development can continue until the Committee closing plenary on the 2nd Nov.
2.5.1.    Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
When the Chair and WG Chair have decided that an output document is ready to seek silent approval over a period of 3 calendar days (minimum required), the documents will be located in the silent approval folder in the file share here DO NOT AMEND THIS DOCUMENT. Any words highlighted in yellow are for the […]
Guideline on Performance Estimation:Â To review and develop a guideline on performance estimation of optical aparatus based on existing Recommendation R0205 (E200-5).
Review telemetry Guideline 1008 Revise Guideline, Last updated 2009
3rd session reviewing guideline on what constitutes a good marine solar module. Goal: To finalise input to the paper and review all edits.
To review WG1 report and any output papers
Develop process of Draft Guideline Tidal flow data capture and display according the workplan 2018-2022
Meeting 1 to meeting 4: Develop process of Draft Guideline AtoN equipment exposed to Extreme Environmental Conditions acording the workplan 2018-2022
2.5.2.    Develop new guideline on radar reflector (reflection) properties
Review of work at ENG14, WG2 report
2.5.1.    Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
2.5.1.    Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
Opening Plenary Agenda: ENG15-1.2.1 Agenda
Opening meeting of Working Group 2 "Technical Knowledge and Sustainability" chaired by Peter Schneider and Jörg Unterderweide. Further information on ENG15-Workprogramm for WG2 is available at https://nextcloud.iala-aism.org/index.php/apps/files/?dir=/Committees/ENG/ENG15/WG2%20-%20Technical%20Knowledge%20and%20Sustainability&fileid=152229
Opening session of WG3 - a chance to review our work for the period and key dates.
Opening Meeting R-Mode task group
WG4 Opening Meeting
WG3 close out session - meeting to review Guidelines, liaison notes and other documents that are due to be finalised and submitted for silent assent. Also review the WG3 report and to raise discussion topics. As the deadline for silent assent is midday I have opted to bring the start of this meeting forward. I […]
What constitutes a good marine AtoN solar panel - Meeting 1: This is the first of three meeting during ENG15, where the current working paper will be reviewed for editorial changes, input and alignment with the IALA style guide. The goal is to finalise this guideline for silent approval at the end of ENG15.
Review of Input Papers Allocation of tasks Correction to G1135 Review of work plan.
Draft Guideline on AtoN Equipment and Structures Exposed to Extreme Conditions: This document aims to reinforce the most relevant information associated with environment variables if they occur under extreme conditions and their incidence on the Aids to Navigation.
Augmentation Services DGNSS Guidance: First session on Tasks 3.4.2 / 3.4.4 Augmentation Services: DGNSS Guidance
2.5.1.    Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
Develop Guideline on meteorological and oceanographical data dissemination: Further developement of the existing draft.
This session is to allow interested members to consider content of Input papers 3.2.6 and 3.2.6.1 and to provide feedback to ENAV as appropriate.
Develop new guideline on radar reflector (reflection) properties: Further development of the darft guideline.
What constitutes a good marine AtoN solar panel - Meeting 2: This is the second of three meeting during ENG15, where the current working paper will be reviewed for editorial changes, input and alignment with the IALA style guide. The goal is to finalise this guideline for silent approval at the end of ENG15.
High accuracy systems: to review the last changes and pending notes on the guideline G1127 aiming for silent approval
MONDAY 7TH MARCH 2022 Time (UTC) Topic Presenter 10.00 Measurement and Calculation of Luminous Intensity of Aids to Navigation Light Wang Lingyan (China MSA) 10.20 Oceanographic and Tsunami monitoring buoys Samir Benouda (Mobilis) 10.40 AtoN distribution adjustment practice of the main channel in Tianjin port, China Li Ang (China MSA) 11.00 Introduction to the tests […]
Draft Guideline on AtoN Equipment and Structures Exposed to Extreme Conditions: This document aims to reinforce the most relevant information associated with environment variables if they occur under extreme conditions and their incidence on the Aids to Navigation.
3rd party AtoN provider quality control. (Joint ARM cooperation): Review ARM liaison note, update document and finalise. ARM had no significant comments, but more detailed reference to the IALA World Wide Academy AtoN model courses in section 3.1.4
Terms of measurement
Proposed meeting to review the comments to the updated G1129 guidelines with a view to providing updated GL for approval at end of this meeting.
It has been proposed by PAP that ENG run a workshop on Sustainability in the provision of AtoN. This meeting willbe chaired by Simon MIllyard, ENG Chair. The objective of this meeting is to: 1 Draft the workshop proposal for approval at ENG15 and ten to Council for approval. 2 Consider a draft Technical programme […]
Status Meeting R-Mode task group
Discussion on Cuba input paper regarding lighthouse personnel: discussion about the content of the input paper / refer to the appropriate presentation during ENG14
2.5.1.    Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
What constitutes a good marine AtoN solar panel - Meeting 3: This is the third of three meeting during ENG15, where the current working paper will be reviewed for editorial changes, input and alignment with the IALA style guide. The goal is to finalise this guideline for silent approval at the end of ENG15.
Review input papers. Finalize G1147 on ERPS. Discuss future standardization of racons and radars. Discuss how ERPS can contribute to resilient PNT. Discuss IMO information paper that came out of ERPS Workshop.
Develop new guideline on radar reflector (reflection) properties: Further development of the draft guideline
The World-Wide Academy has reviewed IALA Recommendation R0141 (E-141) on the training and certification of aids to navigation personnel. It is proposed to update the Recommendation and remove the current annex and publish it as a separate guideline. (see inputpapers ENG15-3.2.7 and ENG15-3.2.7.1)
Leading lines
At ENG14, relevant content was collected in a brainstorming session. These are to be supplemented and further developed. For this task, a TG leader has not yet been appointed. This task will be continued after ENG16.
WG4 Closing Meeting and IALA HLY 2022 Judging Panel
Draft Guideline on AtoN Equipment and Structures Exposed to Extreme Conditions: This document aims to reinforce the most relevant information associated with environment variables if they occur under extreme conditions and their incidence on the Aids to Navigation.
Develop new guideline on radar reflector (reflection) properties: Further development of the draft guideline
WG3 closure meeting to finalise the WG3 deliverables and report. Change to talk about common discussion points as time permits.
The silent approval assessment could start at any time after the opening plenary and no later than 11 March – 12.00 UTC.
Final session Tasks 3.4.2 / 3.4.4 Augmentation Services: DGNSS Guidance
Closing Meeting R-Mode task group
Closing meeting of Working Group 2 "Technical Knowledge and Sustainability"
WG3 consideration of input documents ENG15-3.2.10 on impact of solar farms to visual and radio systems. The aim of this meeting is to understand what we need to do as a WG. I have scheduled this for an hour but anticipate we may not need this long.
I'd like to review where we are and how we move this GL forward between now and ENG16. Due to start at 1315 (GMT) as I'm aware there are other WG3 meetings due to finish at 1300.
WG Session and closing plenary
AUGMENTATION SERVICES + RTCM 2.4 discussion Final session Tasks 3.4.2 / 3.4.4 Augmentation Services: DGNSS Guidance
Review input papers. Finalize G1147 on ERPS. Discuss future standardization of racons and radars. Discuss how ERPS can contribute to resilient PNT. Discuss IMO information paper that came out of ERPS Workshop.
Technology Presentation – Qualcomm: a presentation of the use of Qualcomm on a port environment from Guest Presenters Jean-Michel Rousseau and Shyamal Rmachandran of Qualcomm
2.5.1.    Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
Intersessional WG2 - Task 2.3.1meeting prior the ENG 16 Make a quick review of WG2 - Task 2.3.1 Develop guidance to identify appropriate standards for AtoN equipment with extreme environmental conditions.
The opening plenary of the 16th session of the ENGCommittee will be held physically at IALA HQ on the 17 October 2022 at 11.00 UTC (13.00 CEST) with the possibility to connect remotely and the closing plenary will be held online between 10:00 – 12:00 UTC on Friday 28 October 2022. The physical week will take place at IALA […]
The physical week will take place at IALA HQ between the 17 – 21 October 2022, commencing with the opening plenary on Monday 17 at 11.00 UTC and ending with the closing meeting of the physical week – Friday 21 at 09.00 UTC.
We have two presentations that we will consider first thing Wed morning. These are: Presentation – Galileo Timing and Authentication (EUSPA) Presentation - OSNMA test (GMV)
Time to progress the R-Mode task group activities.
Go over material including IMO Liaison. Discuss future of racons.
Agenda: IALA Conference in Rio de Janeiro 2023 WG4 summary WG1 summary Workshops preparation: Sustainability WS and AtoN Engineering WS Task register
Agenda: IALA Conference WG2 summary WG3 summary
Any document(s) that a task group believes is mature enough for committee approval will be submitted to the working group chair who will review it before passing it to the committee chair. The committee chair and working group chair will determine whether to send the document(s) to participants for silent approval for a discretionary period […]
Resilient PNT Guideline Section 1 review Plan work on Section 2
Resilient PNT Guideline Section 2 review Plan work on Section 3
The deadline for inputs to VTC 3 is March 6th 2023. During the VTC2 meeting, it was: Agreed to continue the drafting using IALA File-Share (this will be reconsider in case some problems with handling different versions of the document appear) Reviewed the Section 2 of the draft Resilient PNT Guideline (thank you for all […]
Based on the updated ToR, from the MASS TF meeting, begin populating the IALA MASS Guideline.
This is a two day meeting (2,5 hours / day) We will revisit and review updates of some parts of the document again: Section 1 (minor additions agreed during VTC3) Section 2 and Appendix 1 (text on navigation signal shadowing, space weather threats to satellites etc.) Section 3 (minor changes agreed during VTC3 + Table […]
This is a two day meeting (2,5 hours / day) We will revisit and review updates of some parts of the document again: Section 1 (minor additions agreed during VTC3) Section 2 and Appendix 1 (text on navigation signal shadowing, space weather threats to satellites etc.) Section 3 (minor changes agreed during VTC3 + Table […]
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
IALA complies with the General Data Protection Regulations of the EU. IALA will include a list of participants with their contact information on the website and in the report of this meeting. Any participant who wishes to remove their contact details from the participants' list should advise the Committee Secretary as soon as possible.
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.