ENAV WG2 TG-3.1.2.2/3.1.4: MRCP Review
ENAV WG2 TG-3.1.2/3.1.4MRCP review - session 1
MRCP review - session 1
Session 2 for the Qualcomm tech review
Continue discussion of Artificial Intelligence, review input on this and develop documents Session 1
Session 2 or the development of the revised MRCP
Session 2 on AI (may include IoT if feedback is received)
To review tasks, input papers and confirm work process for the meeting.
To review the draft IALA Guideline on MASS, focus on ENAV sections
To receive 2 presentations related to the work - AI - Owain Brennan of SeerBI; IMT2020 on buoys - James Thomas of Jet Engineering
Review input paper, identify work to be done Note photos provided for MRCP
Review / revise proposed work program items for 2023-2027
To review work to date and determine next steps
Based on presentations, discussion and identification of candidate technologies for further review
To consider the presentation on AI, the draft document and determine next steps
To review and, if possible, finales Maritime Communications Manual
Summary of all technology reviewed in 2018-2023 work program
If required - review status of liaison notes on IMT / 3GPP
To continue the review, and to consider process to complete the review so that the MarCom Manual can be ready for IALA Conference.
To continue the review of the MASS Guidelines, and consider the roadmap from PAP.
Opening Session, review documents, overview of work for the week
Focus on Radio-Free Comms (ENAV EM-5.1.2.1)
Scheduled presentations (30 min each): Digital Voice & Codec (David Rowe); Update on 3GPP (Hyounhee Koo); Remote Pilotage / technologies to support (Tero Vainio, Sanna Sonninen)
digital voice over VHF (complete)
Review of VDES Perf Standard input from Japan - EM1-5.1.3.7 / EM1-5.1.3.7.1 If time, work on MarCom Manual
Review outcomes of intersessional work, and latest draft version of content.
Start with a presentation of rPNT by K Heikonnen, then review the work programme (existing and proposed)
Review Mass Guideline work, continue work on MarCom. May split into 2 groups - to be confirmed during WG2 plenary.
Finish LEO Sat review, Note SADRM review; Summary of Tech Doc Review (noting EM1-5.1.2.2)
Review content - complete content if possible
Finalise Content.
Review work to date, continue work
Review Report, deal with any other business, close of WG2 (note final session will be for clean up of documents in small groups)
Working in small groups, finalise documents including final read through and formatting. Room location may be adjusted as required.
Based on the updated ToR, from the MASS TF meeting, begin populating the IALA MASS Guideline.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
IALA complies with the General Data Protection Regulations of the EU. IALA will include a list of participants with their contact information on the website and in the report of this meeting. Any participant who wishes to remove their contact details from the participants' list should advise the Committee Secretary as soon as possible.
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.