Close
to

All Dashboards    ARM    ENAV    ENG    VTS

Recurring

ENG15 WG3 TG-3.3 Racons

ENG meeting room A

Review input papers. Finalize G1147 on ERPS. Discuss future standardization of racons and radars. Discuss how ERPS can contribute to resilient PNT. Discuss IMO information paper that came out of ERPS Workshop.

Recurring

ENG15 WG3 TG-3.3 Racons

ENG meeting room A

Review input papers. Finalize G1147 on ERPS. Discuss future standardization of racons and radars. Discuss how ERPS can contribute to resilient PNT. Discuss IMO information paper that came out of ERPS Workshop.

ENG15 Sustainability Workshop drafting

ENG meeting room A

It has been proposed by PAP that ENG run a workshop on Sustainability in the provision of AtoN. This meeting willbe chaired by Simon MIllyard, ENG Chair.  The objective of this meeting is to: 1 Draft the workshop proposal for approval at ENG15 and ten to Council for approval. 2 Consider a draft Technical programme […]

ENG WG3 TG-4.5.2

ENG meeting room A

High Accuracy Review: meeting held to review comments provided to the current High Accuracy Systems Guidelines

Recurring

ENG WG2 TG-1.2.1

ENG meeting room A

Develop Guidance on checking that 3rd party AtoN providers are providing what they are obliged to provide– 3rd party AtoN provider quality control. (Joint  ARM cooperation)

ENG WG2 TG-5.1.1

ENG meeting room A

Meeting#2: Review telemetry Guideline 1008

Recurring

ENG WG2 TG-1.2.1

ENG meeting room A

Develop Guidance on checking that 3rd party AtoN providers are providing what they are obliged to provide– 3rd party AtoN provider quality control. (Joint  ARM cooperation)

ENG – Navguide

ENG meeting room A

Navguide update discussion

ENG WG3 TG-3.4.5

ENG meeting room A

High accuracy systems

ENG WG3 TG-3.4.1

ENG meeting room A

Taks group opening and Presentation: SBAS and gLab by Ginés Moreno

Recurring

ENG WG2 TG-1.2.1

ENG meeting room A

Develop Guidance on checking that 3rd party AtoN providers are providing what they are obliged to provide– 3rd party AtoN provider quality control. (Joint  ARM cooperation)